Sunday, 19 May 2013

Proposed traffic arrangements for Sutton Weaver Swing Bridge repairs


CWaC Highways are in the process of finalising the traffic movements scheme for the duration of the swing bridge repairs.  The latest draft is shown below.

The present plans are to allow the vehicles to be free flowing - no traffic lights.
Proposed traffic movements